Analisis Perbandingan Biaya dan Waktu Penggunaan Bata Ringan dan Batako pada Konstruksi Gedung: Studi Kasus Pembangunan Gedung Mina Asrama Haji Kota Ternate
DOI:
https://doi.org/10.62024/jawp.v2i1.23Keywords:
Material Prices, Time, Material SelectionAbstract
In planning construction costs, planners have an obligation to carry out analysis of cost elements as an aspect of construction performance for efficiency purposes. Costs are derived from the components of material prices, implementation time and labor wages. The choice of materials or construction methods must consider these technical aspects so that efficiency is obtained. This research aims to analyze the choice of using lightweight bricks and bricks in building construction from cost and time considerations. The research results show that the use of bricks is more efficient than the use of lightweight bricks even though the work requires less time. The explanation is that lightweight brick material is a product that must be imported from outside the island, making it a high price.
References
Badan Standardisasi Nasional (BSN). (2002). Analisa biaya konstruksi dan perumahan bangunan gedung.
Deane R.O. Walangitan, & Revo L. Inkiriwang. (2020). Analisis Perbandingan Biaya Material Pekerjaan Pasangan Dinding Bata Merah Dengan Bata Ringan. Jurnal Sipil Statik, 8(3), 311–318.
Indramanik, I. B. G., & Sujarta, ; Ni Kadek Astariani & I Wayan. (2022). Analisis Biaya Pelaksanaan Proyek KonstruksiStudi Kasus: Proyek Pembangunan Ruang Perpustakaan, Laboratorium Komputer, Ruang UKS, Rumah Dinas Kepala Sekolah, dan Penataan Halaman SD Negeri 5 Carangsari. Jurnal Teknik Gradien, 14(01), 1–13. https://doi.org/https://doi.org/10.47329/teknikgradien.v14i1.830
Nyoman, I., & Astana, Y. (2017). Estimasi Biaya Menggunakan Metode Cost Significant Model Pada Pembangunan Peningkatan Jalan (Studi Kasus Pembangunan Peningkatan Jalan Di Kabupaten Sukabumi). Jurnal Riset Rekayasa Sipil Universitas Sebelas Maret, 1(1), 2579–7999.
Pradana1, F., & Nugraheni, F. (2017). Comparative Analysis of Cost and Time for Wall Works Using Lightweight Concrete Pairs with Red Brick in Residential Building Construction Projects. IEEE International Conference on Acoustics, Speech, and Signal Processing (ICASSP) 2017, 41(2), 84–93.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Rais D HI Yusuf, Misron Umar
This work is licensed under a Creative Commons Attribution 4.0 International License.